Traction Room has delivered a number of projects requiring pre-cast concrete installation. Working with our JV partners, we have the capability to manoeuvre large pre-cast units into place. Our highly capable teams possess the skill and application required to prepare supporting structures to the tight tolerances associated with pre-cast work and we have delivered a number of high profile pre-cast projects successfully.

SH1 Brynderwyn Slip Repair

Traction Room was engaged by Fulton Hogan to construct a 24m long retaining wall adjacent to SH1 in Brynderwyn. The wall consisted of concrete embedded steel piles, drilled up to 10m into the ground in variable ground conditions.

Traction Room’s scope of work also included backfill of the wall and construction of a guardrail foundation. The works were constructed adjacent to SH1, with live traffic operating under a stop/go traffic management set up. The presence of the road constrained the working area meaning that activities needed to be well planned to maximise productivity.

Client:
Fulton Hogan

Location:
Brynderwyn, Northland

Dates:
2016 - 2018

Project Value:
Not Disclosed

Contract Type:
Professional Services